How does Simca approach “User-initiated signed updates”, considering power loss mid-update?
Designed in a document, no code yet C0221
Updates are signed packages, applied only when the user asks, from a static server manifest or a file passed by USB or messenger. No background service, no silent check, no telemetry. Plan for: power loss mid-update; rollback; wrong-platform package. It is designed in a document and no code exists.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.
More in Offline-first architecture
- Which edge cases come up around “Offline mode”, in particular regarding clock skew?
- What should owners check about “Package spec”, with a focus on dependencies added automatically?
- What should I plan for with “Online sign-in”, with a focus on sign-in method not decided?
- See it in context with the whole topic
- Search all answers