Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Roadmap

Order, not dates

The repository gives a build order and a platform order. It gives no dates, and this site invents none.

No dates

Nothing on this page is a commitment. Statuses are from the repository snapshot.

StepWhatStatus
0Catalog, strategy, contracts, ADR-0001 and ADR-0002 Built in the repository (checked files or developer tooling, not an app feature)
1Simca Packaging engine and package spec (milestone 1 exists with stub artifacts; real prebuilt artifacts come next; this is where the project is) Built in the repository (checked files or developer tooling, not an app feature)
2Simca Launcher Designed in a document, no code yet
3Simca app on Windows (core selling, cash, inventory, Peru pack) Planned: listed in the catalog, not built
4Android and iOS phones, then tablets, then Linux Planned: listed in the catalog, not built
5Interchange (CONN) and Simca Logistics as separate signed packages Planned: listed in the catalog, not built
6More fiscal packs beyond Peru and the light LATAM set Planned: listed in the catalog, not built
7Regulated and specialist industries flagged as gaps Not decided

The order of steps 3 to 6 beyond "Windows first" is this site's reading of the README and ADR; confirm with the owner.