Launcher, packaging and logistics / CONN: Interchange: Digital Waybilling & Supply Network
What does “GRE offline contingency (guia impresa/contingencia)” depend on?
Planned: listed in the catalog, not built C0444
GRE offline contingency (guia impresa/contingencia) depends on Interchange module root (supply-network core). By itself it covers: Issue offline and regularise with SUNAT when connectivity returns, with a clear pending-regularisation queue. These are catalog links between planned items in “Peru: SUNAT guia de remision electronica (GRE)”.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.