Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Launcher, packaging and logistics / CONN: Interchange: Digital Waybilling & Supply Network

What does “GRE offline contingency (guia impresa/contingencia)” depend on?

Planned: listed in the catalog, not built C0444

GRE offline contingency (guia impresa/contingencia) depends on Interchange module root (supply-network core). By itself it covers: Issue offline and regularise with SUNAT when connectivity returns, with a clear pending-regularisation queue. These are catalog links between planned items in “Peru: SUNAT guia de remision electronica (GRE)”.

Go to the related page

How to read this

The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.

More in CONN: Interchange: Digital Waybilling & Supply Network