Industries / Manufacturing
What is missing in Simca's plan for industrial machinery and equipment, including no engineering bom versioning, routings, shop-floor control or cad?
Not in the catalog yet (a gap) C0742
Honest gaps for industrial machinery and equipment: no engineering BOM versioning, routings, shop-floor control or CAD integration; progress billing exists as an item (RET-0039). Fit rating: good fit, some gaps. The planned catalog is not a shipped product.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.
More in Manufacturing
- What rules should chemicals, plastics and rubber check locally, including chemical-safety, labelling and transport rules?
- What edge cases trip up point-of-sale systems in industrial machinery and equipment, including engineering change after order?
- Which payment types do industrial machinery and equipment usually see, such as staged payments?
- See it in context with the whole topic
- Search all answers