Migrating and buying / Migration
What should I plan for with “Cutover day”, in particular regarding open tabs?
Planned: listed in the catalog, not built C0240
Choosing a quiet day, freezing the old system and starting fresh. Plan for: open tabs; pending orders; rollback. In the catalog it is a plan and nothing is built.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.