Hardware, platform and safety / Hardware and peripherals
Where does “Power backup” fit in Simca, thinking about cut in the middle of a write?
Planned: listed in the catalog, not built C0144
Small UPS units or batteries so a sale and a database write finish during a power cut. Plan for: cut in the middle of a write; battery age; printer power. In the catalog it is a plan and nothing is built.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.