Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Stock, books and reports

Inventory and purchasing

Units of measure, lots and expiry, recipes, counts, purchasing and transfers in the planned Simca inventory module (118

Status labels: Built in the repository (checked files or developer tooling, not an app feature) Designed in a document, no code yet Planned: listed in the catalog, not built Not decided Not in the catalog yet (a gap) No claim made

Where does “Units of measure and conversions” fit in Simca, considering case-to-unit rounding?

Planned C0114

Goods are bought in cases, sold in units and sometimes in fractions. Conversions need to be exact and visible. Plan for: case-to-unit rounding; selling half a unit; two barcodes for one product. In the catalog it is a plan and nothing is built.

Open this answer on its own page

What should I plan for with “Lots and expiry”, with a focus on expired item at the till?

Planned C0115

Tracking batch numbers and expiry dates so the oldest stock goes first and a recall can be traced. Plan for: expired item at the till; mixed lots on one shelf; lot missing on receipt. In the catalog it is a plan and nothing is built.

Open this answer on its own page

What should I plan for with “FEFO and FIFO”, with a focus on wrong rule for a product?

Planned C0116

First-expired-first-out and first-in-first-out picking rules, chosen per product. Plan for: wrong rule for a product; returns re-entering stock; transfers between stores. In the catalog it is a plan and nothing is built.

Open this answer on its own page

How risky is “Recall trace” to get wrong, with a focus on partly sold lot?

Planned C0117

Finding every sale and every shelf unit that came from one supplier batch. Plan for: partly sold lot; customer notification; supplier credit. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Is “Variants and matrices” supported today, considering variant added after sales?

Planned C0118

Size and colour or flavour variants of one product, each with its own barcode and stock. Plan for: variant added after sales; price per variant; bulk edit. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Where does “Bundles and kits” fit in Simca, in particular regarding kit price versus parts price?

Planned C0119

One selling item that consumes several stock items. Plan for: kit price versus parts price; missing component; returns of a kit. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Where does “Recipes and bills of materials” fit in Simca, especially around yield changes?

Planned C0120

A list of ingredients or components consumed when something is made or sold. Plan for: yield changes; substitute ingredient; waste not counted. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Is “Stock counts and cycle counts” supported today, thinking about sales during the count?

Planned C0121

Counting all or part of the stock to find differences, often by section on a rotating schedule. Plan for: sales during the count; blind versus guided counts; count approval. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Which edge cases come up around “Purchase orders and receiving”, thinking about short deliveries?

Planned C0122

Ordering from suppliers, receiving against the order and recording differences. Plan for: short deliveries; price changes between order and invoice; supplier credit notes. In the catalog it is a plan and nothing is built.

Open this answer on its own page

What should I plan for with “Transfers between locations”, with a focus on goods lost in transit?

Planned C0123

Moving stock between stores, rooms or vehicles with in-transit status. Plan for: goods lost in transit; transfer cancelled; cost carried across. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Is “Waste and shrink” supported today, thinking about unrecorded waste?

Planned C0124

Recording damage, theft and spoilage with reasons so patterns appear. Plan for: unrecorded waste; count adjustments hiding theft; donations. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Where does “Reorder points” fit in Simca, in particular regarding seasonal demand?

Planned C0125

Suggesting what to order from sales speed and minimums. Plan for: seasonal demand; supplier lead times; minimum order quantities. In the catalog it is a plan and nothing is built.

Open this answer on its own page

Which edge cases come up around “Barcodes and labels”, considering two products sharing a code?

Planned C0126

Printing price and barcode labels, including those for weighed items. Plan for: two products sharing a code; label printer offline; weight embedded in the code. In the catalog it is a plan and nothing is built.

Open this answer on its own page

What is the plan for “Serial numbers and warranty”, in particular regarding serial scanned twice?

Planned C0127

Tracking individual units for high-value goods and warranty periods. Plan for: serial scanned twice; return after warranty; swap with a different serial. In the catalog it is a plan and nothing is built.

Open this answer on its own page

What should I plan for with “Consignment stock”, considering unsold returns?

Planned C0128

Stock owned by a supplier until sold, with settlement later. Plan for: unsold returns; price disputes; settlement dates. In the catalog it is a plan and nothing is built.

Open this answer on its own page

What is the plan for “Negative stock”, especially around receipts entered late?

Planned C0129

Selling something the system believes is out of stock. A policy choice with accounting effects. Plan for: receipts entered late; count correction; blocking versus warning. In the catalog it is a plan and nothing is built.

Open this answer on its own page