Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Manufacturing

Food production and processing

Recipes, batches, yields and traceability. Core operations map to planned catalog modules; remaining gaps are listed on the industry page.

Close fit Planned NAICS 311

Status

Planned The coverage below describes the planned catalog as of repository commit 455b2c8. No app is released. Everything on this page is a plan. The repository contains a catalog and design documents, not a released app.

How the industry works

Operating characteristics

  • recipe-driven production
  • batch and lot traceability
  • shelf-life and cold storage
  • co-packing
  • sales to retail and wholesale
  • strict hygiene

Typical roles

  • production manager
  • operator
  • quality officer
  • warehouse
  • sales
  • buyer

Day-to-day flows

  • plan a batch from a recipe
  • consume ingredients
  • record yield and waste
  • label with lot and expiry
  • ship to customers
  • trace a lot forward and back

Tenders and payments seen

  • invoice on terms
  • cash on pick-up
  • bank transfers
  • mobile wallets recorded manually

Inventory and assets

  • raw materials
  • work in progress
  • finished goods with lot and expiry
  • packaging

Reports they ask for

  • yield variance
  • cost per batch
  • lot trace
  • expiry
  • waste

Integrations they need

  • scales
  • label printers
  • ERP or accountant
  • retailers' ordering

A day in the life (illustrative scenario)

What the catalog covers

Statuses: C catalogued, P partial, G gap, N no claim. Modules involved: SALE, TKT, INV, PRC, DISC, RET, DLV, CONN, LOGI, CRM, LOYL, GIFT, EMP, CASH, PAY, BK, LITE, RPT, ANL, MULTI, SEC, DATA, FAIL, HW, PE, LATAM, ECOM, PLAT, SET, LNCH, PKGR.

CapabilityStatusCatalog modules
Selling and checkoutC CataloguedSALE, TKT
Inventory, lots, purchasingC CataloguedINV
Pricing, discounts, tax rulesC CataloguedPRC, DISC
Returns, credit, special salesC CataloguedRET
Delivery, waybills, logisticsC CataloguedDLV, CONN, LOGI
Cash drawer, shifts, safeC CataloguedCASH
Tender types and paymentsC CataloguedPAY
Customers, loyalty, gift cardsC CataloguedCRM, LOYL, GIFT
Staff, time clock, payroll basicsC CataloguedEMP
Bookkeeping and ledgerC CataloguedBK, LITE
Reports and analyticsC CataloguedRPT, ANL
Multi-store, multi-register, syncC CataloguedMULTI
Security, audit, backup, failsafesC CataloguedSEC, DATA, FAIL
Hardware and peripheralsC CataloguedHW
Country fiscal packsC CataloguedPE, LATAM
Integrations, API, settingsC CataloguedECOM, PLAT, SET, LNCH, PKGR
Manufacturing planning (routings, work centres)P Partialno dedicated module
Enterprise accounting (consolidation, intercompany)P Partialno dedicated module

Gaps

  • recipes and BOM exist (KDS-0029, KDS-0033, KDS-0034) and lots exist, but no routings, capacity planning, HACCP records, quality testing or production scheduling

Closest catalog items

Items whose names or descriptions match this industry. Matching is by keyword, so read each as a pointer, not a promise.

Sub-verticals

Regulation themes to verify

These are themes, not advice and not compliance claims.

  • food-safety management and traceability rules
  • allergen and nutrition labelling
  • export documentation (themes to verify)

Edge cases that break naive systems

  • yield below recipe
  • ingredient substitution
  • lot recall
  • co-packer shortage

Classification

NAICS
NAICS 311 (indicative; verify codes) · sectors 31-33
Fortune 500 industry labels
Food Consumer Products; Food Production
Fit
Close fit

Public references consulted

  • Odoo documentation: bill of materials and work centers (excerpt)

Questions

Is Simca ready for food production and processing today?
No. Simca is in the design stage and has no released app. The catalog lists planned items relevant to this industry; Core operations map to planned catalog modules; remaining gaps are listed on the industry page.
What is missing for food production and processing?
recipes and BOM exist (KDS-0029, KDS-0033, KDS-0034) and lots exist, but no routings, capacity planning, HACCP records, quality testing or production scheduling.
Does this page give tax or regulatory advice?
No. Regulation entries are themes to verify with local authorities and advisers.

Is your industry here?

Tell us what your business needs. We will say honestly whether the plan covers it.