Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Industries / Construction, trades and real assets

How do construction and engineering businesses bid, including set a project budget?

Planned: listed in the catalog, not built C0799

Bid is one of the usual flows in construction and engineering. Others: set a project budget; buy materials; issue stores to sites. The planned catalog touches this through modules SALE, TKT, INV, PRC, DISC, RET; fit rating: close fit. Planned only; nothing is built.

Go to the related page

How to read this

The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.

More in Construction, trades and real assets