Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Industries

Construction, trades and real assets

4 industries in the Construction, trades and real assets sector group.

Status labels: Built in the repository (checked files or developer tooling, not an app feature) Designed in a document, no code yet Planned: listed in the catalog, not built Not decided Not in the catalog yet (a gap) No claim made

What is missing in Simca's plan for construction and engineering, think of progress invoicing and retention exist as items (ret-0039, ret-0040)?

Gap C0797

Honest gaps for construction and engineering: progress invoicing and retention exist as items (RET-0039, RET-0040), job costing as SVC-0010; no estimating, scheduling, change-order management or subcontractor compliance. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in construction and engineering, think of change orders?

Planned C0798

In construction and engineering watch for: change orders; retention release; materials stolen from site. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

How do construction and engineering businesses bid, including set a project budget?

Planned C0799

Bid is one of the usual flows in construction and engineering. Others: set a project budget; buy materials; issue stores to sites. The planned catalog touches this through modules SALE, TKT, INV, PRC, DISC, RET; fit rating: close fit. Planned only; nothing is built.

Open this answer on its own page

What rules should construction and engineering check locally, for example licensing?

Planned C0800

Themes to verify for construction and engineering: licensing; safety and site rules; lien and payment-term rules; building codes (themes to verify). These are themes, not advice, and Simca claims no compliance with any of them.

Open this answer on its own page

Which reports matter most in construction and engineering, for example cost vs. budget?

Planned C0801

Reports commonly wanted in construction and engineering: cost vs. budget; progress billings; retention held; subcontractor payments. Stock and assets to track: site stores; materials by project; tools. The RPT module lists planned reports; nothing is built.

Open this answer on its own page

What is missing in Simca's plan for homebuilders and real-estate development, think of no contract management, construction draws or land-development accounting?

Gap C0802

Honest gaps for homebuilders and real-estate development: no contract management, construction draws or land-development accounting; staged payments can be recorded as deposits and instalments only. Fit rating: good fit, some gaps. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in homebuilders and real-estate development, think of change of unit?

Planned C0803

In homebuilders and real-estate development watch for: change of unit; cancellation; upgrade priced after contract. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

How do homebuilders and real-estate development businesses sell a lot or home, including collect staged deposits?

Planned C0804

Sell a lot or home is one of the usual flows in homebuilders and real-estate development. Others: collect staged deposits; track construction milestones; handle upgrade selections. The planned catalog touches this through modules SALE, TKT, INV, PRC, DISC, RET; fit rating: good fit, some gaps. Planned only; nothing is built.

Open this answer on its own page

What rules should homebuilders and real-estate development check locally, for example sales contract and deposit rules?

Planned C0805

Themes to verify for homebuilders and real-estate development: sales contract and deposit rules; zoning and permits; warranty rules (themes to verify). These are themes, not advice, and Simca claims no compliance with any of them.

Open this answer on its own page

Which reports matter most in homebuilders and real-estate development, for example sales and backlog?

Planned C0806

Reports commonly wanted in homebuilders and real-estate development: sales and backlog; deposits held; cost to complete; warranty. Stock and assets to track: materials; model-home items; options catalogue. The RPT module lists planned reports; nothing is built.

Open this answer on its own page

What is missing in Simca's plan for skilled trades and field service, for example no route planning, customer-site history or equipment-registry tools beyond?

Gap C0807

Honest gaps for skilled trades and field service: no route planning, customer-site history or equipment-registry tools beyond generic customer notes; no on-site photo documentation listed. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in skilled trades and field service, for example job needs a return visit?

Planned C0808

In skilled trades and field service watch for: job needs a return visit; customer disputes the estimate; van stock mismatch. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Who works in skilled trades and field service and what do they need, including dispatcher?

Planned C0809

Typical roles in skilled trades and field service: dispatcher; technician; owner; apprentice; bookkeeper. The business is characterised by jobs scheduled at customer sites; estimates and invoices on site; parts in the van. The planned catalog serves these through permissions, shifts and reports.

Open this answer on its own page

What integrations do skilled trades and field service depend on, including scheduling tools?

Planned C0810

Integrations skilled trades and field service typically need: scheduling tools; accountant; parts suppliers. In Simca's plan most are files or optional adapters rather than cloud APIs; marketplace and ERP connectors are gaps.

Open this answer on its own page

Which payment types do skilled trades and field service usually see, think of cash?

Planned C0811

Typical tenders in skilled trades and field service: cash; cards via phone Tap to Pay; bank transfer; mobile wallets recorded manually. Simca's stance is cash first, wallets like Yape and Plin recorded by hand, and cards only through the phone's Tap to Pay. All planned.

Open this answer on its own page

What is missing in Simca's plan for equipment rental and leasing, such as rental is covered by generic items (svc-0007, svc-0008?

Gap C0812

Honest gaps for equipment rental and leasing: rental is covered by generic items (SVC-0007, SVC-0008); no telematics, lease accounting or asset-register depreciation beyond what the bookkeeping module lists. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in equipment rental and leasing, such as late return?

Planned C0813

In equipment rental and leasing watch for: late return; damage dispute; asset lost. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

What rules should equipment rental and leasing check locally, including liability and insurance rules?

Planned C0814

Themes to verify for equipment rental and leasing: liability and insurance rules; safety inspection rules; lease accounting themes (themes to verify). These are themes, not advice, and Simca claims no compliance with any of them.

Open this answer on its own page

Which reports matter most in equipment rental and leasing, including utilisation?

Planned C0815

Reports commonly wanted in equipment rental and leasing: utilisation; revenue per asset; overdue returns; maintenance cost. Stock and assets to track: rental fleet as assets; accessories; consumables; maintenance parts. The RPT module lists planned reports; nothing is built.

Open this answer on its own page

How do equipment rental and leasing businesses check out an asset, for example collect a deposit?

Planned C0816

Check out an asset is one of the usual flows in equipment rental and leasing. Others: collect a deposit; track days out; check in and inspect. The planned catalog touches this through modules SALE, TKT, INV, PRC, DISC, RET; fit rating: close fit. Planned only; nothing is built.

Open this answer on its own page