Industries / Construction, trades and real assets
What edge cases trip up point-of-sale systems in construction and engineering, think of change orders?
Planned: listed in the catalog, not built C0798
In construction and engineering watch for: change orders; retention release; materials stolen from site. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.
More in Construction, trades and real assets
- What is missing in Simca's plan for construction and engineering, think of progress invoicing and retention exist as items (ret-0039, ret-0040)?
- How do construction and engineering businesses bid, including set a project budget?
- What rules should construction and engineering check locally, for example licensing?
- See it in context with the whole topic
- Search all answers