Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Industries / Construction, trades and real assets

What is missing in Simca's plan for construction and engineering, think of progress invoicing and retention exist as items (ret-0039, ret-0040)?

Not in the catalog yet (a gap) C0797

Honest gaps for construction and engineering: progress invoicing and retention exist as items (RET-0039, RET-0040), job costing as SVC-0010; no estimating, scheduling, change-order management or subcontractor compliance. Fit rating: close fit. The planned catalog is not a shipped product.

Go to the related page

How to read this

The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.

More in Construction, trades and real assets